ISKRIT Accounts

ISKRIT / Management & staff / Shift schedule

Management & staff

Shift schedule with rule-based auto-rostering and summarized time accounting

Enter staff, a shift pattern and the number of posts, and the roster builds itself: people are placed so every day the posts are covered, totaling each person's hours against the monthly norm. Auto-rostering is deterministic, not AI.

Data current as of 2026-08-24

Open the calculator → Free, no sign-up · interface in Russian

Standards

Working-time mode and accounting under the Russian Labour Code: shift work (art. 103), summarized accounting (art. 104), overtime capped at 120 hours per year (art. 99).

Input

Staff list, shift pattern (2/2, 24h-on/72h-off, 5/2), posts per shift, month.

Output

Ready shift roster, daily coverage, hours against norm, print and XLSX.

What it does

The tool and the platform

The tool

Fully open
  • A shift roster, post coverage by day and the balance of hours
  • Rest and long-run checks, replacement search for a shift
  • Roster export in XLSX and printing, the project is saved as a file
  • A roster of any size and any number of posts, the draft stays in the browser
  • Works instantly, no sign-up required

ISKRIT·Operations made to order

Built around your process

This platform does not exist yet: we build it around your workflow. Here is what goes into it.

  • One roster for the whole organisation: departments, posts and rates
  • Documents for an inspection: roster order, acknowledgement sheet, timesheet
  • Roster version history and sign-off by the manager

Questions

How does the tool build the roster?

With a deterministic algorithm, no AI: the pattern sets a cycle of on and off days, and each person is given a phase offset so posts stay covered across days.

How many people are needed?

A guide: posts times cycle length divided by the number of working days in the cycle. The tool suggests headcount and colors under-coverage and overshoot days.

Is the working-time norm taken into account?

Each person's hours are compared against an indicative monthly norm for a 40-hour week. The exact norm by the official work calendar and summarized accounting per period are not computed yet.

In the reference

← All ISKRIT tools · Engineering reference · Open the Shift schedule calculator