ISKRIT Accounts

ISKRIT / Environment & safety / Occupational risks

Environment & safety

Occupational risk assessment: hazard register and risk maps

For each workplace the tool maintains a hazard register, assesses the risk before and after control measures by the Fine-Kinney method and a risk matrix, and produces an assessment map and a report for approval.

Data current as of 2026-08-24

Open the calculator → Free, no sign-up · interface in Russian

Standards

Russian Labor Code article 214, Ministry of Labor order 926, hazard classifier 776n, Fine-Kinney and matrix methods.

Input

Workplaces, hazards, probability, exposure and severity scores.

Output

Risk levels before and after measures, assessment map, report for approval.

What it does

The tool and the platform

The tool

Fully open
  • Risk levels before and after measures, the assessment card and the report
  • Load workplaces from Excel, export to XLSX, print
  • Calculations are stored on the server and reopen next time, company letterhead with signatures
  • Works instantly, no sign-up required

ISKRIT·HSE made to order

Built around your process

This platform does not exist yet: we build it around your workflow. Here is what goes into it.

  • Register of workplaces, hazards and measures with completion control
  • Work permits, training and instructions on one board
  • History of assessments and reviews for every workplace

Questions

Are control measures taken into account?

Yes. Risk is assessed before and after measures: for every hazard you set the score reduction, the tool computes the residual level, and the workplace level is taken from the worst residual risk.

Which methods?

Fine-Kinney (risk = probability × exposure × consequences) and a probability-severity matrix with configurable boundaries.

More in Environment & safety

← All ISKRIT tools · Engineering reference · Open the Occupational risks calculator