A platform is the tools of one field put together: one database, roles and reports. Site Foreman is free for one building, then 5,000 RUB a month or 50,000 RUB a year per site. Five fields can be tried as live demos: Engineering Surveys, Site Control, Metrology, Survey and the rebar shop; demo data is fictional and stays in your browser.
ISKRIT·رئيس الموقعمتاح
A site foreman workspace: from the phone on site, not spreadsheets in your head
- Buildings floor by floor: what is running, what is late, where the material lies
- Material in yards and on floors: receipt, drag to move, evening recount
- Defects are assembled from choices and go out as a Word order
- Rework with hours and the deduction sum, a monthly crew certificate
مجاني لمبنى واحد وساحة واحدة. الاشتراك 5000 روبل شهريًا لكل موقع، 50000 روبل سنويًا، أول 30 يومًا مجانًا.
ISKRIT·Geoعرض
نظام LIMS لمختبر جيوتقني: من البئر إلى التقرير
- الآبار والعينات ومهام الفحص في سجل واحد
- وحدات حساب: إحصاء GOST 20522، ميكانيكا التربة، التدرج، الأعمدة والمقاطع
- تصدير DXF وXLSX واستيراد AGS4
ISKRIT·رقابة الموقععرض
لوحة عمل الرقابة الإنشائية: ملاحظات واعتمادات
- الملاحظات والأوامر على لوحة كانبان مع السجل
- أدوار المقاول والرقابة والمالك، اعتماد بنقرة واحدة
- صور ومستندات مع كل بطاقة
- مطابقة الكميات وكشف المقايسة وشهادات إنجاز الأعمال في مكان واحد
ISKRIT·القصعرض
Rebar shop: from the bar schedule to steel consumption
- Bar schedule by structure with bending shapes
- Shift task with cutting maps and welded joints
- Stock of new bars and reusable offcuts with an operations journal
- Steel consumption by structure on the concreting date
ISKRIT·المعايرةعرض
Metrology service: instrument park, due dates and scope of accreditation
- Instrument register and a verification calendar with a due-date traffic light
- Reconciliation with the national register: a fresh certificate is pulled into the card
- Method readiness: it is visible which work cannot be performed today
- Batch request, coded labels, schedule forms and a report for the audit
ISKRIT·المساحةعرض
Survey control: as-built survey against tolerances
- As-built survey journal with automatic deviation from design
- Tolerances per the structural codes, for piles the limit follows the diameter
- Deviation statement and a register of as-built drawings
- Setting-out base with a coordinate list and point preservation
ISKRIT·البيئةIn development
Company environmental reporting: impact fees, monitoring, waste passports and declarations in one loop.
ISKRIT·السلامةIn development
Occupational health and safety: risk assessment, workplace assessment, permits, training and orders on one board.