ISKRIT Sign in Sign up

B2B

A platform is the tools of one field put together: one database, roles and reports. Site Foreman is free for one building, then 5,000 RUB a month or 50,000 RUB a year per site. Five fields can be tried as live demos: Engineering Surveys, Site Control, Metrology, Survey and the rebar shop; demo data is fictional and stays in your browser.

ISKRIT·Site ForemanLive

A site foreman workspace: from the phone on site, not spreadsheets in your head

  • Buildings floor by floor: what is running, what is late, where the material lies
  • Material in yards and on floors: receipt, drag to move, evening recount
  • Defects are assembled from choices and go out as a Word order
  • Rework with hours and the deduction sum, a monthly crew certificate

Free for one building and one yard. Subscription 5,000 RUB a month per site, 50,000 RUB a year, the first 30 days free.

ISKRIT·Engineering SurveysDemo

A LIMS for the geotechnical laboratory: from borehole to report

  • Boreholes, samples and test assignments in one journal
  • Calculation modules: GOST 20522 statistics, soil mechanics, grading, logs and sections
  • DXF and XLSX export, AGS4 import
ISKRIT·Site ControlDemo

A working board for construction supervision: issues and approvals

  • Issues and punch lists on a kanban board with history
  • Contractor, supervision and client roles, one-click approvals
  • Photos and documents attached to every card
  • Volume reconciliation, estimate statement and completion certificates in one place
ISKRIT·Rebar shopDemo

Rebar shop: from the bar schedule to steel consumption

  • Bar schedule by structure with bending shapes
  • Shift task with cutting maps and welded joints
  • Stock of new bars and reusable offcuts with an operations journal
  • Steel consumption by structure on the concreting date
ISKRIT·MetrologyDemo

Metrology service: instrument park, due dates and scope of accreditation

  • Instrument register and a verification calendar with a due-date traffic light
  • Reconciliation with the national register: a fresh certificate is pulled into the card
  • Method readiness: it is visible which work cannot be performed today
  • Batch request, coded labels, schedule forms and a report for the audit
ISKRIT·SurveyDemo

Survey control: as-built survey against tolerances

  • As-built survey journal with automatic deviation from design
  • Tolerances per the structural codes, for piles the limit follows the diameter
  • Deviation statement and a register of as-built drawings
  • Setting-out base with a coordinate list and point preservation

In development

ISKRIT·EcologyIn development

Company environmental reporting: impact fees, monitoring, waste passports and declarations in one loop.

ISKRIT·HSEIn development

Occupational health and safety: risk assessment, workplace assessment, permits, training and orders on one board.