A platform is the tools of one field put together: one database, roles and reports. Site Foreman is free for one building, then 5,000 RUB a month or 50,000 RUB a year per site. Five fields can be tried as live demos: Engineering Surveys, Site Control, Metrology, Survey and the rebar shop; demo data is fictional and stays in your browser.
ISKRIT·Şantiye şefiKullanımda
A site foreman workspace: from the phone on site, not spreadsheets in your head
- Buildings floor by floor: what is running, what is late, where the material lies
- Material in yards and on floors: receipt, drag to move, evening recount
- Defects are assembled from choices and go out as a Word order
- Rework with hours and the deduction sum, a monthly crew certificate
Bir bina ve bir depo alanı için ücretsiz. Abonelik şantiye başına aylık 5.000 RUB, yıllık 50.000 RUB, ilk 30 gün ücretsiz.
ISKRIT·GeoDemo
Geoteknik laboratuvar için LIMS: sondajdan rapora
- Sondajlar, numuneler ve deney atamaları tek defterde
- Hesap modülleri: GOST 20522 istatistiği, zemin mekaniği, granülometri, loglar ve kesitler
- DXF ve XLSX dışa aktarma, AGS4 içe aktarma
ISKRIT·Saha kontrolüDemo
Yapı denetiminin çalışma panosu: bulgular ve onaylar
- Bulgular ve talimatlar geçmişiyle birlikte kanban panosunda
- Yüklenici, denetim ve işveren rolleri, tek tıkla onay
- Her karta fotoğraf ve belge
- Metraj karşılaştırma, keşif icmali ve hakediş belgeleri tek yerde
ISKRIT·KesimDemo
Rebar shop: from the bar schedule to steel consumption
- Bar schedule by structure with bending shapes
- Shift task with cutting maps and welded joints
- Stock of new bars and reusable offcuts with an operations journal
- Steel consumption by structure on the concreting date
ISKRIT·MetrolojiDemo
Metrology service: instrument park, due dates and scope of accreditation
- Instrument register and a verification calendar with a due-date traffic light
- Reconciliation with the national register: a fresh certificate is pulled into the card
- Method readiness: it is visible which work cannot be performed today
- Batch request, coded labels, schedule forms and a report for the audit
ISKRIT·ÖlçmeDemo
Survey control: as-built survey against tolerances
- As-built survey journal with automatic deviation from design
- Tolerances per the structural codes, for piles the limit follows the diameter
- Deviation statement and a register of as-built drawings
- Setting-out base with a coordinate list and point preservation
ISKRIT·ÇevreIn development
Company environmental reporting: impact fees, monitoring, waste passports and declarations in one loop.
ISKRIT·İSGIn development
Occupational health and safety: risk assessment, workplace assessment, permits, training and orders on one board.