ISKRIT / Construction site / Hidden works certificates
Construction site
Hidden works certificates with surveys and test reports
The engineer enters the parties, representatives, materials and the list of works once, and the certificates are assembled in the forms of order 344/pr. The survey drawing and test reports enter the certificate by verification code, 99 checks compare details, dates and test values with the design before issue. The developer accepts the set: the tool shows what exactly was checked and does not promise acceptance.
Data current as of 2026-09-26
Standards
Order of the Ministry of Construction of 16.05.2023 No. 344/pr, GOST R 51872-2024, SP 70.13330.2012, SP 45.13330.2017, GOST 22733-2016, GOST 5180-2015.
Input
Parties and representatives, materials with quality documents, design documents and structures with design values, the list of works, ISKRIT drawing and report codes or values of external test reports.
Output
Certificates in Word with a verification code, registers of documents, checks of the set, the project documentation register, the archive and a link for the supervisor.
What it does
- Parties and representatives per 344/pr entered once per project
- Tax and registration numbers checked by the check digit
- Materials with quality documents, upload from Excel
- Structures with design values: concrete class, W, F, compaction factor, rebar
- General works log per 1026/pr in Word
- Certificates from the log with one button
- Concrete works log and welding works log per SP 70, concrete curing log
- Photos and electronic signatures on log records
- Hidden works and responsible structures certificates per 344/pr
- ISKRIT survey drawings and test reports in the certificate by code
- 99 checks before issue
- Issue with a verification code and QR
- As-built register in Word and Excel, the whole set as an archive
- Links for the supervisor, the developer and the designer
- XML for the state supervision system per the Ministry schemas
- Certificate on the client's form in the full version
Price
Free version
- One project with all checks
- 5 issued certificates and 3 issued survey drawings with a verification code
- After the trial month your data and issued documents stay
Full access
- No limits on projects, issued certificates and drawings
- Certificates on the client's Word template with tags, projects for the whole team
- Two people from one company 2,980 RUB a month, three 3,970 RUB
- 19,900 RUB a year for one person: 12 months for the price of 10
- The first 30 days free after sign-up
Pay by card, SBP or T-Pay on the site, or by invoice for companies.
Questions
Can the general works log be kept electronically?
Order 1026/pr allows a paper log and an electronic log with signed records. The log is printed in Word on the paper form, and an electronic signature is attached to records and issued certificates: a .sig file from CryptoPro or CryptoARM or a signature in the browser through the CryptoPro CAdES Browser plug-in. The signature is checked against the document and the signer is read from the certificate. For the state supervision and urban planning systems the log and issued hidden works certificates are exported to XML per the Ministry of Construction schemas.
What is checked, and will the set be accepted?
Party details by check digit, the commission and the validity of orders, dates of works, tests and survey, quality documents of materials, test values against the design, survey points out of tolerance and references to withdrawn codes. The code proves that a document was issued and has not changed, not that the measurements are right. The 344/pr forms are recommended and the developer approves the list and the forms, so the tool does not promise acceptance.
Can a certificate be issued on the client's document?
Yes, in the full version. The client's Word document with tags in double curly braces is uploaded once, the tool shows found, unknown and broken tags and repeats a table row for lists. .doc and .docm files are not accepted: save them in Word as .docx.
What happens to the data after the trial month?
Projects and issued documents stay and open. One project with all checks, five issued certificates and three issued drawings with a code stay free for good, and verification by code has no end date.