ISKRIT / Construction site / Bill of quantities
Construction site
Bill of quantities from a cost estimate, grouped by section
Estimate lines turn into a compact bill of quantities: it groups rows by section in order of first appearance, computes the cost of each line, the section subtotal, and the overall total. Lines are entered manually or uploaded from Excel using the template.
Data current as of 2026-08-24
Standards
The schedule follows the layout used by construction planning departments: section, unit rate code, description, unit of measure, quantity, unit price, cost.
Input
Estimate lines: section, code, description, unit, quantity, unit price. Entered manually or uploaded from Excel using the template.
Output
A schedule by section, line costs, section subtotals, overall total, and XLSX export.
What it does
- Lines grouped by estimate section
- Cost computed for every line
- Section subtotals and an overall total
- Estimate lines uploaded from Excel
- Finished schedule exported to XLSX
The tool and the platform
The tool
- Bill of quantities by section, line costs and subtotals
- Load the whole estimate from Excel with no line cap, export the schedule to XLSX
- Calculations are stored on the server and reopen next time, company letterhead with signatures
- Works instantly, no sign-up required
ISKRIT·Site Control demo
The work of a whole department: roles, history and modules linked together.
- The bill of quantities lives in the site and feeds the acts
- Estimate changes are visible as an edit history
- Items are linked to the work done and to findings
Questions
Is the section mandatory?
No. Lines with no section are collected into a separate group and still count toward the overall total.
What if no unit price is given?
The schedule is still built from quantities; cost is not computed for that line and it does not enter the total.
Is the section order preserved?
Yes, sections appear in the order in which they first occur in the source lines.