ISKRIT / engineering reference ← to reference

The eight out of control tests on a Shewhart chart

Updated: August 4, 2026 · ISKRIT

A point outside a control limit is only the first of eight signals. The other seven detect patterns that stay inside the limits, and they are what make a control chart more sensitive than a simple tolerance check.

Zones

The band between the centre line and each control limit is split into three equal zones, each one sigma wide. Zone C is nearest the centre line, zone B is the middle, zone A is the outermost, up against the limit. The tests are written in terms of these zones on both sides of the chart.

The eight tests

TestPatternDetects
1one point beyond zone Aa large sudden shift or an outlier
2nine points in a row on one side of the centre linea small sustained shift
3six points in a row rising or fallingdrift, tool wear, reagent ageing
4fourteen points alternating up and downover-adjustment, or two alternating sources
5two of three consecutive points in zone A or beyonda moderate shift
6four of five consecutive points in zone B or beyonda small shift
7fifteen points in a row in zone Cstratification, or limits computed too wide
8eight points in a row outside zone C on both sidesmixture of two distributions

The two counter-intuitive ones

Tests 7 and 8 flag data that looks too good and data that avoids the middle. Fifteen consecutive points hugging the centre line is not a well behaved process, it usually means the limits were calculated from a period that contained extra variation, or that subgroups were formed across sources that cancel each other. Test 8 is its mirror: points sit away from the centre on both sides, which is the signature of two processes plotted on one chart, two shifts, two instruments, two operators.

The cost of running all eight

Each test has its own false alarm probability, and they add up. Test 1 alone gives roughly one false signal in 370 points. Enabling all eight brings the combined rate to something closer to one in 90. That is a deliberate trade: more sensitivity to real shifts, more investigations that find nothing. A laboratory running daily control samples should decide which tests it applies and write that decision into its procedure, rather than switching them on and off after the fact.

Questions

Do the tests apply to range charts too? Test 1 always does; the run tests are normally applied to the averages chart, since the range distribution is skewed and the zone logic assumes symmetry.

What comes after a signal? Find the special cause. Recomputing limits to make the signal disappear is the one response that guarantees the chart stops working.

All eight are checked automatically, with the indices of the points involved, in the control chart tool.

More in the reference:
Measurement uncertainty calculator: GUM budget with Type A, Type B and expanded U
Area from coordinates calculator: shoelace formula for survey plots
Bearing and distance from coordinates: survey inverse calculator
Rotating shift patterns: covering the posts and balancing the hours
Calibration intervals: setting them, shortening them, defending them
Turning an estimate into a bill of quantities that foots
Progress billing: percent complete, carry-forward and retention
Checking claimed quantities: the design schedule and the survey
Pile capacity from CPT: how the LCPC method reads a cone trace
Driven and bored piles: why the same soil gives different capacity
What belongs on a borehole log, and what quietly gets left off
Drawing a cross section: correlating layers between boreholes
From an AGS4 file to a laboratory summary: what the groups carry
Characteristic values: turning a set of test results into one number
Void ratio, porosity and saturation from one density test
When one soil layer is really two: splitting geotechnical units
ASTM D4254 minimum index density: procedure and Dr calculator
Relative density Dr and density index Id are not the same number
USCS classification step by step: ASTM D2487
Cu and Cc: what the two gradation coefficients actually tell you
Dual symbols in USCS: the 5 to 12 percent fines band
EN ISO 14688-1 against USCS: two different size ladders
AGS4 file validation: what the rules actually check
AGS4 syntax: the five rules that break a delivery
ASTM D2435 oedometer test: from the curve to Cc, mv and Eoed
Converting oedometer modulus to Young’s modulus
EN ISO 17892-5 and ASTM D2435: where the two diverge
ASTM D1196 plate load test: modulus and subgrade reaction
DIN 18134: Ev1, Ev2 and the compaction ratio
Ménard pressuremeter modulus: ASTM D4719 and EN ISO 22476-4
Hydraulic conductivity from a pumping test: Dupuit calculator and formulas
Shewhart control chart constants: A2, A3, B3, B4, D3, D4, d2, c4
Repeatability and reproducibility limits: where 2.77 comes from
How rebar cutting plans are optimised: the cutting stock problem
Cutting waste in rebar fabrication: what percentage is normal
Rebound hammer calibration: why the factory curve is not enough
Kerf and offcut: what a linear cutting plan has to account for
Earthwork volume from survey points: grid, TIN and cross sections
Fire load density: the formula, the calorific values and the traps
Explosive atmosphere zones 0, 1, 2 and 20, 21, 22 explained
Pollution charges per tonne: how the over-limit multiplier works
The Russian environmental fee: who pays, when, and how the advances work