A geotechnical unit is a claim: that every sample inside it comes from one population and can be described by one set of numbers. The claim is testable, and a surprising share of units drawn by eye do not survive the test.
The test
A unit is provisionally drawn from the field descriptions and the borehole logs, on geology and origin. Only then are the numbers checked. Two things disqualify a provisional unit: scatter above the limit set for that property, and a systematic trend of the property with depth or with position on the site.
The distinction matters. Scatter without a trend means the samples are mixed, and the fix is to look for a criterion that separates them. A trend with low scatter around it means the unit is real but not uniform, and the fix is either to split it into sub-units or to describe the property as a function of depth.
Why averaging over a trend is worse than either option
Consider a sand whose deformation modulus rises from 18 MPa at the top of the unit to 34 MPa at the base, with little scatter at any one depth. The mean is 26 MPa. Used at the base of a foundation resting near the top of the unit, 26 MPa overstates the stiffness by nearly half. Used for a pile toe near the bottom, it understates it by a quarter. The averaged number is wrong in both directions and safe in neither.
What a high coefficient of variation is telling you
| Observation | Likely cause | Action |
|---|---|---|
| High V, results in two clumps | two soils under one description | split on the criterion that separates the clumps |
| High V, results trend with depth | a real gradient | split into sub-units or model the trend |
| High V, one borehole differs | a lens or a lateral change | split laterally, not by depth |
| High V, scatter random | test technique or sampling disturbance | check the laboratory before the geology |
The order of operations
Geology first, statistics second. Splitting a unit purely because the numbers scatter, with no geological reason for the boundary, produces units that cannot be mapped between boreholes and that no one can identify on the next site visit. The statistics are there to refute a unit, not to invent one.
The unit delineation tool tests each provisional unit for scatter and for a depth trend, reports which property failed and by how much, and proposes the split rather than applying it.
Rotating shift patterns: covering the posts and balancing the hours
Calibration intervals: setting them, shortening them, defending them
Turning an estimate into a bill of quantities that foots
Progress billing: percent complete, carry-forward and retention
Checking claimed quantities: the design schedule and the survey
Pile capacity from CPT: how the LCPC method reads a cone trace
Driven and bored piles: why the same soil gives different capacity
What belongs on a borehole log, and what quietly gets left off
Drawing a cross section: correlating layers between boreholes
From an AGS4 file to a laboratory summary: what the groups carry
Characteristic values: turning a set of test results into one number
Void ratio, porosity and saturation from one density test
ASTM D4253 and D4254: maximum and minimum index density
Relative density Dr and density index Id are not the same number
USCS classification step by step: ASTM D2487
Cu and Cc: what the two gradation coefficients actually tell you
Dual symbols in USCS: the 5 to 12 percent fines band
EN ISO 14688-1 against USCS: two different size ladders
AGS4 file validation: what the rules actually check
AGS4 syntax: the five rules that break a delivery
ASTM D2435 oedometer test: from the curve to Cc, mv and Eoed
Converting oedometer modulus to Young’s modulus
EN ISO 17892-5 and ASTM D2435: where the two diverge
ASTM D1196 plate load test: modulus and subgrade reaction
DIN 18134: Ev1, Ev2 and the compaction ratio
Ménard pressuremeter modulus: ASTM D4719 and EN ISO 22476-4
Permeability from a pumping test: the Dupuit formulas
Shewhart control chart constants: A2, A3, B3, B4, D3, D4, d2, c4
The eight out of control tests on a Shewhart chart
Repeatability and reproducibility limits: where 2.77 comes from
How rebar cutting plans are optimised: the cutting stock problem
Cutting waste in rebar fabrication: what percentage is normal
Rebound hammer calibration: why the factory curve is not enough
Kerf and offcut: what a linear cutting plan has to account for
Earthwork volume from survey points: grid, TIN and cross sections
Fire load density: the formula, the calorific values and the traps
Explosive atmosphere zones 0, 1, 2 and 20, 21, 22 explained
Pollution charges per tonne: how the over-limit multiplier works
The Russian environmental fee: who pays, when, and how the advances work