Bearing and distance from coordinates: survey inverse calculator
Updated: September 30, 2026 · ISKRIT
The inverse computation gives the distance and bearing between two points from their coordinates: distance = √(ΔN² + ΔE²) and the bearing is the angle whose tangent is ΔE / ΔN, placed in the right quadrant by the signs of the differences. The forward computation goes the other way and gives the coordinates of a new point from a bearing and a distance.
Distance and bearing between two points
Coordinates from bearing and distance
How it works
Differences. ΔN = NB - NA and ΔE = EB - EA. Northing runs to grid north and easting to grid east, and bearings are measured clockwise from grid north.
Quadrant. The acute angle arctan(|ΔE| / |ΔN|) is the quadrant bearing. The signs of the differences name it and convert it to a whole-circle bearing.
| ΔN | ΔE | Quadrant bearing | Whole-circle bearing |
|---|---|---|---|
| + | + | N θ E | θ |
| - | + | S θ E | 180° - θ |
| - | - | S θ W | 180° + θ |
| + | - | N θ W | 360° - θ |
Check. The back bearing differs from the forward bearing by exactly 180°. The distance can be checked twice as ΔN / cos(bearing) and ΔE / sin(bearing).
Forward computation. ΔN = distance · cos(bearing), ΔE = distance · sin(bearing). The signs of the sine and cosine place the new point in the right quadrant.
Worked example
A (N 6210300.00, E 512040.00), B (N 6210351.00, E 512035.20). ΔN = +51.000 and ΔE = -4.800, so the line runs north-west. Distance = √(51.000² + 4.800²) = 51.225. θ = arctan(4.800 / 51.000) = 5°22′36″, the quadrant bearing is N 5°22′36″ W and the whole-circle bearing is 360° - θ = 354°37′24″. The forward computation from A with this bearing and distance returns B to the millimetre.
Questions
Grid bearing or true bearing? Coordinates on a projected grid give grid bearings. True bearings differ by the grid convergence at the point.
Which units? Any, as long as both points use the same: the distance comes out in the units of the coordinates.
Why is my bearing off by 90° or 180°? Northing and easting are usually swapped. The calculator expects northing first for each point.
Deviations of set-out and as-built points from design coordinates, with a drawing, are computed by the as-built survey calculator.
Measurement uncertainty calculator: GUM budget with Type A, Type B and expanded U
Area from coordinates calculator: shoelace formula for survey plots
Rotating shift patterns: covering the posts and balancing the hours
Calibration intervals: setting them, shortening them, defending them
Turning an estimate into a bill of quantities that foots
Progress billing: percent complete, carry-forward and retention
Checking claimed quantities: the design schedule and the survey
Pile capacity from CPT: how the LCPC method reads a cone trace
Driven and bored piles: why the same soil gives different capacity
What belongs on a borehole log, and what quietly gets left off
Drawing a cross section: correlating layers between boreholes
From an AGS4 file to a laboratory summary: what the groups carry
Characteristic values: turning a set of test results into one number
Void ratio, porosity and saturation from one density test
When one soil layer is really two: splitting geotechnical units
ASTM D4254 minimum index density: procedure and Dr calculator
Relative density Dr and density index Id are not the same number
USCS classification step by step: ASTM D2487
Cu and Cc: what the two gradation coefficients actually tell you
Dual symbols in USCS: the 5 to 12 percent fines band
EN ISO 14688-1 against USCS: two different size ladders
AGS4 file validation: what the rules actually check
AGS4 syntax: the five rules that break a delivery
ASTM D2435 oedometer test: from the curve to Cc, mv and Eoed
Converting oedometer modulus to Young’s modulus
EN ISO 17892-5 and ASTM D2435: where the two diverge
ASTM D1196 plate load test: modulus and subgrade reaction
DIN 18134: Ev1, Ev2 and the compaction ratio
Ménard pressuremeter modulus: ASTM D4719 and EN ISO 22476-4
Hydraulic conductivity from a pumping test: Dupuit calculator and formulas
Shewhart control chart constants: A2, A3, B3, B4, D3, D4, d2, c4
The eight out of control tests on a Shewhart chart
Repeatability and reproducibility limits: where 2.77 comes from
How rebar cutting plans are optimised: the cutting stock problem
Cutting waste in rebar fabrication: what percentage is normal
Rebound hammer calibration: why the factory curve is not enough
Kerf and offcut: what a linear cutting plan has to account for
Earthwork volume from survey points: grid, TIN and cross sections
Fire load density: the formula, the calorific values and the traps
Explosive atmosphere zones 0, 1, 2 and 20, 21, 22 explained
Pollution charges per tonne: how the over-limit multiplier works
The Russian environmental fee: who pays, when, and how the advances work